Hello!
I have the following issue (the problem is occured after year end carry forward).
The WBS element got incorrect annual distribution and as a result the funds cannot be transfered to another WBS.
1) this is how the budget is distributed by years (CJ30):
The full budget (which is in overall line) is distributed into 2014 year.
It can be checked also in trn CJI8:
This WBS has available funds, it can be checked through CJEO:
2) When I'm trying to transfer funds I got an error (CJ34):
The same error I have for 2015 year, which is quite logical since there is no budget in 2015-2016.
3) The system doesn't allow to change 2014 year budget:
Both CJ34:
and CJ30 where 2014 is not displayed at all.
I need to transfer money but I can't.
Please help me with the ideas how to fix this or find workaround.
PS: The time frame in Budget Profile is set as "1" for Past (that is why 2014 is not displayed) and this cannot be changed since it is global setting.