Hi everyone,
I have created an asset master data and I have posted its acquisition in period jan/2015 (ANLA-AKTIV = jan/2015). I have performed the program J_1AA011 (asset revaluation for inflation), but appeared the following message: " XXXXXXXXX-X No revaluation posted for period 001/2015". If I run it in february/2015, the posting is filled correctly. This occured even if I fill in the AFAMP the option "acquisition control period", like "01"( pro rata at period start date).
Is it not possible to post inflation revaluation in the same period of acquisition of an fixed asset ? Should I use any user exit for this issue?
Thanks for all.
Marcus Vinicius